• What is the demand for petroleum products in Cambodia?
  • The total demand for petroleum products in Cambodia is increasing further, with economic growth exceeding 7% per year. The average annual growth rates of the major petroleum products over the last 5 years were 9.1% for gasoline, 7.9% for diesel oil, and 22.3% for liquefied petroleum gas (LPG).
  • What is the petroleum supply chain in Cambodia?
  • Transport Sector Questionnaire Chapter 4 clarifies the current situation of the petroleum supply chain in Cambodia. All petroleum products are imported, and most are shipped by tankers from Thailand, Singapore, and Viet Nam. However, LPG can be imported by tank-truck, so the import route is different from gasoline and diesel oil.
  • What is the Cambodia petroleum master plan 2022-2040?
  • The Cambodia Petroleum Master Plan 2022-2040 was prepared by the General Department of Petroleum (GDP) with technical input and support from the Economic Research Institute for ASEAN and East Asia (ERIA). The data and information expressed herein help to facilitate the Ministry¡¯s energy planning processes and policy formulation.
  • Where can petroleum products be delivered to Phnom Penh & Siem Reap?
  • As for location, delivery can be done to Battambang, Phnom Penh, and Siem Reap without traffic congestion. The two new terminals are the second terminals, and the petroleum products will be transferred from Sihanoukville. Tank trucks seem to be the means of transfer for the time being, but pipeline and railway may be the options in the future.
  • How to forecast Cambodia’s petroleum demand by Province in 2040?
  • As described earlier, two methods were applied to forecast Cambodia¡¯s petroleum demand by province in 2040. One is the application of oil companies¡¯ data, and the other is the use of the energy consumption survey results from selected provinces.
  • How many oil terminals are planned in Phnom Penh?
  • The total capacity of oil terminals planned in the next few years is 70,380 kl, and the total storage capacity of Cambodia will be about 590,000 kl. The two new oil terminals planned in Phnom Penh are inland terminals 20 km¨C40 km away from central Phnom Penh, not on the Mekong River coast.